Banner

Airport Receives Federal Stimulus Funds



overview


The Airport has received a $14,878,026 federal grant authorized by the American Recovery and Reinvestment Act of 2009 (ARRA). This grant will be used to build a parallel taxiway to runway 14/32.

PROJECT DESCRIPTION AND PURPOSE

The taxiway will be approximately 6,000 feet long and 75 feet wide.

Construction of the taxiway will remedy a safety issue. Planes currently leaving the passenger terminal have to cross the mid-point of runway14/32 in order to get to that runway’s northwest end. The new taxiway will run parallel to the runway and will eliminate the need for crossing the runway. Eliminating the need to cross the runway greatly reduces the chance of a ground collision between airplanes.

project cost


The cost of project design, construction and construction administration is $14,878,026. This total cost is covered by the ARRA grant.

More information about the American Recovery and Reinvestment Act of 2009 can be found at: www.recovery.gov.


 
 

© 2009 2300 N. Airport Boulevard Tel : 417.868.0500
Springfield-Branson National Airport Springfield, Missouri 65802 Email: info@flyspringfield.com

HOME AIRLINES AIRPORT GUIDE PARKING/TRANSPORTATION TRAVEL TIPS GENERAL AVIATION ABOUT

 

Flyspringfield Home Page Link Link to Information on the Springfield-Branson Area Link to Information About How the Airport Works Link to General Aviation Info Link to Travel Tips Link to Transportation and Parking Information Link to Airport Guide Link to Flight and Airline Information Link to Home Page Click here to view the non-mobile version